Chandani Chowk was the worst bottleneck in west Pune for a decade. Eight ramps and a rebuilt interchange later, here is what actually changed and what did not.
Blackstone Realty · 2 August 2026 · 6 min read
For most of the last decade, the single strongest argument against buying in Bavdhan was a traffic light. Chandani Chowk sat where Paud Road met National Highway 48 and the Mumbai to Pune Expressway, and it could not carry what was being put through it.
That is the thing that has changed, and it is the reason the suburb reads differently in 2026 than it did in 2020.
The National Highways Authority of India rebuilt the junction as a multi-level interchange at a reported cost of around ₹865 crore. The integrated structures were completed in March 2024.
The design is eight ramps rather than a single flyover, giving grade-separated movement in eight directions: Bavdhan, Paud Road, Mulshi Road, Kothrud, Baner and Aundh, the Katraj-Dehu Road bypass, the Expressway towards Mumbai and NH-48 south towards Satara.
The practical effect is that traffic which used to stop at a signal to cross now passes over or under. Through-movement and turning movement stopped competing for the same tarmac.
Bavdhan sits immediately beside the junction, which is unusual and is the whole locational case for the suburb.
Very few Pune addresses put Kothrud, Baner, Aundh and Hinjawadi within reach without driving through the middle of the city. Bavdhan does, because all four are reachable off different arms of the same interchange. The rebuild made those movements work at a scale that the old signal could not.
Being fair about it, three things are unchanged.
The interchange is built, open and being used. That puts it in a different category from the infrastructure most Pune microsites cite, which is usually proposed, approved or under way.
Which means it is already in the price. Bavdhan re-rated when the junction opened, and a buyer arriving in 2026 is paying for a benefit that exists rather than one that might.
That is the right way round. Paying today for infrastructure that is already delivered is ordinary. Paying today for infrastructure that is drawn on a plan is how people end up funding somebody else’s option.
Drive from Bavdhan to wherever you actually go, on a weekday, at the hour you would leave. Then drive back at the hour you would return.
Those two numbers are the ones you live with. The junction has made them better than they were. It has not made them zero, and no brochure that says otherwise has been in the car with you at nine on a Tuesday.
Sources
Locality
Fourteen kilometres and about thirty minutes is the published figure. It is accurate at some hours and optimistic at the ones you would actually travel.
10 August 2026 · 5 min read
Locality
Bavdhan sits beside the junction where Paud Road, NH-48 and the Expressway meet. That is the whole case for the address, and the one thing that used to spoil it has been fixed.
6 August 2026 · 5 min read
Locality
Commutes get the attention. The trips that decide whether an address works are the school run and the chemist at ten at night, and those are different journeys entirely.
6 August 2026 · 6 min read
Carpet areas, the price list and the plans go to registered buyers before they reach the portals.